REMOVING CHOIR STALLS FROM CHURCH
May 26, 2014
REFECTORY DOUBLES AS CHURCH
May 26, 2014
Altar-East End
Altar – Close Up
Salve Icon – West End
Guest Area – South Side
BEGIN INSTALLING PLASTIC DUST COVERS
June 4, 2014
REMOVING 10,000 LB ALTAR
June 20, 2014
Jacking altar off floor
& loading onto skid
Moving altar toward entrance ramp
Sliding altar down ramp
Success! Out the door into the hallway
REMOVING UPPER PLATFORM
June 28, 2014
Breaking up concrete slab with air hammer
Digging out concrete rubble and sand gravel backfill
Tossing out rubble
PLATFORM & SURROUNDING SLATE REMOVAL COMPLETED
July 3, 2015
View towards west wall after removal of platform and tabernacle & icon
WOODSHOP-PREPARING NEW CHURCH FURNISHINGS
July 19, 2014
Pre-cut lumber for new choir stalls
Mock-up of choir stall desk, lectern, principle celebrant’s chair
MODEL OF CHURCH RENOVATION
July 29-2014
Floor plan-facing east wall
All new overhead lighting – September 19, 2014
Subfloor conduit – 800 feet – September 25, 2014
Hauling concrete for finished floor – October 20, 2014
Pouring concrete for finished floor
over radiant heating tubes – October 20, 2014
Heating tubes under main floor, about 5,000 feet of tubing
Checking indirect lighting, November 21, 2014
Inspecting floor – November 21, 2014
Organ Assembly – December 3, 2014
consisting of 145,000 parts, including 457 pipes
Choir stalls awaiting assembly – January 22, 2015
Installing Guest Area Benches – January 22, 2015
Repaired stain glass window – west wall – January 23, 2015
Aerial view – Tuesday, January 27, 2015
Church boilers & heating system – Friday, February 26, 2015
Back of guest area – Friday, March 13, 2014
Center showing new enclosure railing – Friday, March 13, 2014
Choir stalls – Friday, March 13, 2014
An Invitation To Donate To our Church Renovation