Church Renovation

 REMOVING CHOIR STALLS FROM CHURCH
May 26, 2014

OLYMPUS DIGITAL CAMERA [1]

OLYMPUS DIGITAL CAMERA [2]

OLYMPUS DIGITAL CAMERA [3]

REFECTORY DOUBLES AS CHURCH
May 26, 2014

OLYMPUS DIGITAL CAMERA [4]

Altar-East End

Altar - Close Up [5]

AltarClose Up

OLYMPUS DIGITAL CAMERA [6]

 Salve Icon – West End

OLYMPUS DIGITAL CAMERA [7]

Guest Area – South Side

BEGIN INSTALLING PLASTIC DUST COVERS
June 4, 2014

OLYMPUS DIGITAL CAMERA [8]

OLYMPUS DIGITAL CAMERA [9]

REMOVING 10,000 LB ALTAR
June 20, 2014

OLYMPUS DIGITAL CAMERA [10]

Jacking altar off floor
& loading onto skid

OLYMPUS DIGITAL CAMERA [11]

Moving altar toward entrance ramp

OLYMPUS DIGITAL CAMERA [12]

Sliding altar down ramp

OLYMPUS DIGITAL CAMERA [13]

Success! Out the door into the hallway


REMOVING UPPER PLATFORM
June 28, 2014

OLYMPUS DIGITAL CAMERA [14]

Breaking up concrete slab with air hammer

OLYMPUS DIGITAL CAMERA [15]

Digging out concrete rubble and sand gravel backfill

OLYMPUS DIGITAL CAMERA [16]

Tossing out rubble

PLATFORM & SURROUNDING SLATE REMOVAL COMPLETED
July 3, 2015


OLYMPUS DIGITAL CAMERA [17]

   View towards west wall after removal of platform and tabernacle & icon

WOODSHOP-PREPARING NEW CHURCH FURNISHINGS
July 19, 2014

OLYMPUS DIGITAL CAMERA [18]

Pre-cut lumber for new choir stalls

OLYMPUS DIGITAL CAMERA [19]
Mock-up of choir stall desk, lectern, principle celebrant’s chair

MODEL OF CHURCH RENOVATION
July 29-2014

Model-facing east wall [20]

Floor plan-facing east wall

 

Model-facing west wall [21]

Floor plan-facing west wall

Church overhead lighting [22]

All new overhead lighting – September 19, 2014

OLYMPUS DIGITAL CAMERA [23]

 Subfloor conduit – 800 feet – September 25, 2014

OLYMPUS DIGITAL CAMERA [24]

Hauling concrete for finished floor –  October 20, 2014

OLYMPUS DIGITAL CAMERA [25]

Pouring concrete for finished floor
over radiant heating tubes – October 20, 2014

heating tubes [26]

Heating tubes under main floor, about 5,000 feet of tubing

Final pour - 1 [27]

Final pour, October 31, 2014

OLYMPUS DIGITAL CAMERA [28]

Checking indirect lighting, November 21, 2014

OLYMPUS DIGITAL CAMERA [29]

Inspecting floor – November 21, 2014

OLYMPUS DIGITAL CAMERA [30]

Organ Assembly – December 3, 2014
consisting of 145,000 parts, including 457 pipes

OLYMPUS DIGITAL CAMERA [31]

Choir stalls awaiting assembly – January 22, 2015

OLYMPUS DIGITAL CAMERA [32]

Installing Guest Area Benches – January 22, 2015

 

OLYMPUS DIGITAL CAMERA [33]

Repaired stain glass window – west wall – January 23, 2015

Aerial view-church renovation [34]

Aerial view – Tuesday, January 27, 2015

 

OLYMPUS DIGITAL CAMERA [35]

Church boilers & heating system – Friday, February 26, 2015

36ac2b82-255c-46d0-bcad-045ebd0d09d7 [36]

 Back of guest area – Friday, March 13, 2014

 

583ded09-1db2-485d-84ac-56bd541b4282 [37]

Center showing new enclosure railing – Friday, March 13, 2014

 

1b62a328-a6bd-49bf-a1c2-3b7867daa3d4 [38]

Choir stalls – Friday, March 13, 2014

An Invitation To Donate To our Church Renovation [39]